Work History

2003

  • Assisted El Paso with diagnostics on the caverns at the Boiling Gas Storage Facility.
  • Provided third party monitoring services to El Paso with the Mechanical Integrity Test of a leased LPG salt dome cavern in South Texas.
  • Workover on LPG Storage Well #5 at El Paso’s facility located near Anse la Butte, Louisiana.
  • Workover on Saltwater Disposal Well (SWD) #5 at Egan Hub Partner’s facility located near Evangeline, Louisiana.
  • Workover on Saltwater Disposal Well (SWD) #3 at Egan Hub Partner’s facility located near Evangeline, Louisiana.
  • Workover on LPG Storage Well #4 at El Paso’s facility located near Anse la Butte, Louisiana.
  • Workover on Natural Gas Storage Well #5 at Egan Hub Partner’s facility located near Evangeline, Louisiana.
  • Workover operations, on-site supervision, & technical support for the workover of El Paso’s Hattiesburg, Miss. Brine Disposal Well #2.
  • Engineering and technical consultation to Enstor (Iberdrola Subsidiary) on their West Texas natural gas storage project.
  • Brine disposal well workover for El Paso at Hattiesburg, Mississippi.

Return to Projects

 
 
  © Copyright 2007 Sabine Storage & Operations. All Rights Reserved.