 |
|
 |
| |
Work History
2003
- Assisted El Paso with diagnostics on the caverns at the Boiling Gas Storage Facility.
- Provided third party monitoring services to El Paso with the Mechanical Integrity Test of a leased LPG salt dome cavern in South Texas.
- Workover on LPG Storage Well #5 at El Paso’s facility located near Anse la Butte, Louisiana.
- Workover on Saltwater Disposal Well (SWD) #5 at Egan Hub Partner’s facility located near Evangeline, Louisiana.
- Workover on Saltwater Disposal Well (SWD) #3 at Egan Hub Partner’s facility located near Evangeline, Louisiana.
- Workover on LPG Storage Well #4 at El Paso’s facility located near Anse la Butte, Louisiana.
- Workover on Natural Gas Storage Well #5 at Egan Hub Partner’s facility located near Evangeline, Louisiana.
- Workover operations, on-site supervision, & technical support for the workover of El Paso’s Hattiesburg, Miss. Brine Disposal Well #2.
- Engineering and technical consultation to Enstor (Iberdrola Subsidiary) on their West Texas natural gas storage project.
- Brine disposal well workover for El Paso at Hattiesburg, Mississippi.
Return to Projects
|
|
|
| |
|